Demolition has Begun.

We finally have our signed lease and are moving forward with the project.  We have hired John Webb Construction as our contractor and demolition began today.  Prep work will take place for the next few days with the big demolition project of removing the bank vault happening on Monday the 19th!  The plan is to have all the demolition, trenching, and floor work done by the end of December.  New walls will begin going up at the beginning of January.


Tuesday, September 27, 2011

Store Design

Lot's of time and effort has gone into store design.  We want to create an environment that's fun and comfortable.  The inside of the building is currently dark with low wattage lighting, darker colors on the walls and floor, and a black ceiling.  Attached is a picture of a Jamba Juice concept that we like.  Although we won't be changing the architecture of the building, we do like the colors and design elements of this rendering and hope to incorporate some of the same look into our facility.